BusinessWell Capping
A SelectSmart.com Flowchart by mcargol
To print this page, right mouse click, open "Print preview", "Print" or a similar option depending on your browser, then use the controls to size this page appropriately. Go to SelectSmart.com/flowchart/flowchart.php?id=1001544 for the original version of this flowchart. Find and create other free decision making tools at SelectSmart.com. Use our interactive selectors to find the best college, best career, right religion, most appropriate dog breed, best college major and more.  
SelectSmart.com SelectSmart.com®
Make Your Own Flowchart
© SelectSmart.com. All Rights Reserved.


                 
Loss of Well Control with BOP failing to isolate flow
Activate Relief Well Plan
Activate Source Control Response Plan
Liquid Hydrocarbons Present?
YES
Activate Oil Spill Response Plan

YES






NO


Rig Attempts to disconnect LMRP from Well (EQD)
NO
Attempt Secondary LMRP Disconnect or Cut Riser. Operations Successful?
YES
Recover Rig and transit to safe area
Continue with Relief Well and Source Control Plans
 

YES


NO






Conduct Subsea Site Survey and Assessment
BOP Intervention panel Accessible?
Debris Present which may impeded BOP Intervention and/or Capping Stack Installation?
 
 



YES

NO

YES




Apply Subsea Dispersant at source point
NO
Conduct BOP Intervention and attempt to shut-in well. Shut In Successful?
Conduct Debris Removal Operations and prepare for Capping Stack Installation.
 
 



YES






Prepare well for Capping Stack Installation
Well Isolated!
 
 
 


YES







Install Capping Stack and Conduct Soft Shut-In. Shut-In Successful?
NO
Continue with Relief Well Operations
Implement Containment Plan